2026 cost guide · Canberra
What does a knockdown rebuild cost in Canberra?
The quick answer: a compact, quality home starts from around $850,000, and most of our rebuilds land between $1 million and $1.6 million, depending on your block, the design and the finish.
At a glance
The numbers that matter.
A compact home
Where a quality knockdown rebuild in Canberra typically starts.
Most of our rebuilds
Depending on your block, the design and the level of finish.
Building rate, single storey
About $4,500/m² double storey. Under roof, including GST.
Demolition
A typical three-bed ex-government house, plus about $5k if there’s asbestos.
Based on recent Freedom Built homes in Canberra. A guide, not a quote. Last updated November 2026.
| Type of home | Single storey | Double storey |
|---|---|---|
| Quality | from $3,900/m² | from $4,500/m² |
| High-performance / Passive House | from $4,400/m² | from $5,100/m² |
| Architectural | from $5,350/m² | from $6,200/m² |
A breakdown of costs
So, what are you really paying for?
Soil, slope and approvals change from suburb to suburb, so it pays to know what sits inside the price.
Demolition
From $22kPlus about $5k for asbestos. Clearing the garden adds about $750 to $1,000 for grass and shrubs, up to $2,500 for big trees and roots.
Site preparation
$20k–$80k+Soil tests, earthworks, retaining and access. Sloping blocks and reactive clay cost more.
The build
From $3,900/m²Turnkey, under roof (home, garage, porch and alfresco), single storey. High-performance from $4,400/m², architectural from $5,350/m².
Extras
$50k–$300k+Landscaping, pool, solar and custom finishes. We price these once the house is covered.
How we work out a budget together
Five things set the price.
Every home we price comes down to the same five levers. Some you can’t change. Others you can turn up or down to land on a budget you’re comfortable with.
- 1
Your site
Slope, soil, trees, access and what has to come down first. You can’t change it, but it can move the price a lot.
- 2
Square metres
The biggest lever. Every square metre needs a slab, frame, roof, plaster, paint and power. Fewer metres, lower cost.
- 3
Design & look
Facade materials, steel, big openings, ceiling heights and feature details. The look that sits on top of the size.
- 4
Performance
Seven stars is now the minimum. Better glazing, insulation, wraps, ventilation and airtightness. The bigger the home, the harder it is.
- 5
Fittings & finishes
Joinery, stone, tiles, tapware, flooring, appliances and lighting. Where your taste shows most.
Two more things sit outside the five levers. Must-do items are what every home needs beyond the house itself: a driveway, services, landscaping, fencing and often retaining walls. We set these aside first, then the rest of the budget goes to the house. Nice-to-haves, like a pool or a pergola, come last.
A real example
Where the money went on a home we’re building now
A two-storey family home of about 310 m² with a basement, on a sloping Canberra block. Seven stars, custom joinery and European appliances.
Must-do items 6.8%
Outside the house, but every home needs them.
- Driveway, paths, crossover and kerb2.1%
- Retaining walls1.7%
- Landscaping1.6%
- Sewer, stormwater, rainwater tank and power1.1%
- Fencing, gates, letterbox and clothesline0.4%
Nice-to-haves 8.0%
Extras this family chose. We price these last, once the house is covered.
- Plunge pool, pool fencing and heater5.8%
- Motorised pergola1.4%
- Basketball court0.8%
Share of the contract price, including GST and our margin. Some items could sit in two places, such as windows (part look, part performance); we’ve split them as fairly as we can.
Rebuild or renovate?
Why not just renovate?
Renovations can look cheaper on paper. They often aren’t, once the old house starts giving up its secrets.
- Unseen problems. Asbestos, poor insulation, termites or dodgy wiring can blow the budget mid-job.
- Patchwork results. It’s hard to modernise an old home without it feeling like old and new stuck together.
- Compliance. If the work is more than 50% of the home’s value, the whole house may need upgrading to current code.
- Design limits. You’re working inside the old footprint and structure.
- Disruption. Living through a reno is noisy and dusty, and hidden issues stretch the timeline.
- Cost creep. Renovating usually costs more per m² than building new, especially kitchens, bathrooms and structural changes.


- National finalist · 2026 HIA Australian Housing Awards
- Winner · 2025 HIA ACT & Southern NSW Townhouse Development of the Year
Before the build starts
Demolition and site preparation.
Demolishing a typical three-bed, one-bath ex-government house costs around $22,000, plus about $5,000 for asbestos, common in homes built before 1990. Site preparation typically starts from $20,000 and depends on three things:
Soil testing
A geotechnical report decides your footings. Clay-heavy soils, common in Belconnen, Gungahlin and parts of Tuggeranong, need deeper, dearer footings.
Earthworks
Levelling, cut and fill for a level building pad. Sloping blocks, like many in Weston Creek or Hackett, often need retaining walls and extra drainage.
Site access
Rear-only access, narrow driveways and battle-axe blocks mean more for machinery, scaffolding and labour, plus fencing and erosion control.
How we price a knockdown rebuild
Your number, not a guess.
We measure the whole area under roof, so the rate is honest and comparable. Demolition, site cut, landscaping, driveways, fencing and pools are separate lines. Once your design and selections are locked in, you get a genuinely fixed price.
Common questions
Knockdown rebuild costs, answered
How much does a knock down rebuild cost in Canberra?
A compact, quality home typically starts from around $850,000, and most of our rebuilds land between $1 million and $1.6 million. The build itself starts from about $3,900 per square metre under roof for a single-storey home, including GST. Demolition, site preparation, landscaping and extras are on top.
How much does demolition cost?
Removing a typical three-bedroom, one-bathroom ex-government house costs around $22,000, plus about $5,000 if asbestos needs removing. Clearing the garden adds roughly $750 to $1,000, or up to $2,500 for large trees and roots.
Is it cheaper to knock down or renovate?
Per square metre, a knockdown rebuild is often better value. Extensions typically cost about 20% more per square metre than a new build, from around $4,700, because of the work to open up and tie into the existing house, and hidden issues can add more.
Why does site preparation vary so much?
Because every block is different. Reactive clay needs deeper footings, sloping blocks need cut, fill and retaining, and tight access costs more in machinery and labour. It typically starts from $20,000 and can pass $80,000.
What is the average cost of a knock down rebuild in Canberra?
From our recent homes, most knockdown rebuilds in Canberra land between $1 million and $1.6 million all up, and a compact, quality home starts from around $850,000. The spread comes from five things: the block, the size of the home, the design, the energy performance and the finishes.
What does it cost per square metre to build a house in Canberra?
Our building rates, including GST and measured under roof (home, garage, porch and alfresco): from $3,900 per square metre for a quality single-storey home, about $4,500 for double storey, from $4,400 for a high-performance or Passive House home, and from $5,350 for an architectural home. Demolition, site works and landscaping are on top.
Do you offer knock down rebuild packages?
No. A package is a set plan at a set price, dropped onto your block. We design every home for its own block, slope and sun, then price that design line by line. You still get one fixed price before you sign, and our price guide gives you a ballpark in about a minute.
How much does it cost to knock down one house and build two?
A dual occupancy or duplex is priced the same way, per square metre across both homes. Our two-storey dual occupancy work starts from around $4,500 per square metre under roof, including GST, plus one demolition and the site works. Services, driveways and landscaping are needed for two homes, so allow more for those.
How long does a knock down rebuild take?
Most knockdown rebuilds take 12 to 18 months from the first meeting to handover. That covers design, approvals, demolition and the build. One of our recent Watson homes was designed in six months and built in seven.
What is not included in these prices?
The building rates cover the home itself, turnkey. They do not include land, design and engineering fees, approval fees, demolition, site preparation, landscaping, driveways, fencing, pools or finance. We price each of those for your block once the design is known.
Is the price fixed?
Yes. Once your design and selections are locked in, you get a genuinely fixed price, built from a 3D model with every trade quoted at least twice.
Indicative only. The prices, rates and ranges on this page are a general guide based on past Freedom Built projects. They are not a quote, an offer or advice. Every home is priced from its own plans, site and selections, and only a signed contract sets a price. Please don’t rely on these figures to buy land, arrange finance or make other decisions. See our website terms.